MarafiAl Tamyeez Contracting

General contracting · Riyadh

Excellence is the foundation of every project

Marafi Al Tamyeez General Contracting builds villas and commercial buildings from foundations to finishing, with engineering precision and respect for drawings, schedules and safety.

  • Registered with the Saudi Contractors Authority
  • Riyadh Chamber member
  • VAT registered
Marafi crew checking a column formwork for plumb on a Riyadh site

Real photos from our sitesEvery photo on this site shows work by the Marafi team

A registered contractor, and you can verify it yourself

  • Contractor membership Saudi Contractors Authority No. 2119211993 Verify number
  • Chamber of Commerce membership Riyadh Chamber No. 1035903 Verify number
  • VAT registration Zakat, Tax and Customs Authority No. 300037786900003 Verify number

02How we build

Quality that starts below ground

We never shortcut the hidden stages. Each one is inspected before the next covers it.

  1. 01

    Termite treatment

    Before anything else, the soil is treated against termites with approved products; treating them after construction is hard and costly.

  2. 02

    Moisture barrier

    A polyethylene sheet is laid carefully with generous overlaps to stop ground moisture rising into the concrete.

  3. 03

    Blinding concrete

    A layer of plain concrete gives a clean, level base for footing steel and keeps soil away from the reinforcement.

  4. 04

    Footings and foundations

    Formwork and rebar for footings, ground beams and necks, set out precisely, then poured and coated with bitumen below ground.

  5. 05

    Columns and plumb checks

    Column formwork is fixed and checked for plumb before and after each pour so every column stands true.

See all twelve stages

03Why Marafi

The right partner for quality, professionalism and delivery

Built to the drawings

We build exactly what the approved drawing shows and check with the engineer before, not after.

A complete site team

Labourers, technicians, supervisors and engineers, each in their role, with modern pouring and formwork equipment.

Safety at every stage

PPE, secured excavations and safe scaffolding are part of how we work every day.

Transparent proposals

An itemised proposal by stage, with what each item covers spelled out so there are no surprises.

Marafi crew in full PPE on a raft reinforcement grid

04Before & after

Turning old spaces into modern ones

Before: Interior staircase rehabilitation
After: Interior staircase rehabilitation
BeforeAfter

Interior staircase rehabilitation

A damaged, bare concrete staircase clad in marble with skirting and a timber handrail.

Before: From bare soil to a finished bedroom
After: From bare soil to a finished bedroom
BeforeAfter

From bare soil to a finished bedroom

A room with a soil floor and exposed services became a refined space with new flooring, concealed lighting and a high-quality finish.

See all our work

Three-storey residential concrete frame

05Marafi

A registered Saudi contractor in Riyadh

Marafi specialises in general contracting of every kind. We deliver complete solutions that combine quality, accuracy and commitment to specifications and deadlines: residential villas and commercial buildings, reinforced concrete, interior and exterior finishing, infrastructure, boundary walls and tanks, and structural works.

About us

06Blog

Practical guides before you build

All articles

Frequently asked questions

Questions owners ask before they start

Where does Marafi work?

We are based in Al Aqeeq, Riyadh, and work across Riyadh’s districts. For projects outside Riyadh, contact us to discuss.

Is Marafi a licensed contractor?

Yes. Marafi Al Tamyeez General Contracting is registered with the Saudi Contractors Authority (membership 2119211993), is a Riyadh Chamber member and is VAT registered; the numbers can be checked on the official sites.

Do you show prices on the website?

No. Cost depends on drawings, area and specification, so we visit the site, review the drawings and send an itemised proposal.

How do I get started?

Send us the project type, location and current stage on WhatsApp and we will arrange a site visit and review the drawings with you.

Start your project

Have a plot or a building that needs to be built right?

Tell us the project type and location. A Marafi engineer will arrange a site visit, review your drawings and send a detailed proposal.

Call now WhatsApp