Aluminium kitchens: pros, cons and how they compare with wood and MDF
A kitchen that shrugs off water and termites, but only if it is designed and fitted well. The pros and cons of aluminium kitchens and how to keep yours looking good.

Services
Modern aluminium kitchens built to a high standard, practical and resistant to moisture and heat.
We build aluminium kitchens with modern designs and high quality, turning our clients’ ideas into elegant, practical spaces. Aluminium suits Riyadh kitchens because it ignores humidity and does not warp with heat.
Aluminium Kitchens
Frequently asked questions
Aluminium resists moisture, insects and heat better; wood offers a warmer look. We explain the trade-offs for your use.
Yes. We remove the old kitchen, relocate points if needed and install the new one.
It depends on size, design and material availability; we confirm timing when the design is approved.
A kitchen that shrugs off water and termites, but only if it is designed and fitted well. The pros and cons of aluminium kitchens and how to keep yours looking good.
Gypsum ceilings and lighting, floors, paint, doors and bathrooms, with detail that reflects your taste.
Learn more 12We turn old spaces into modern ones with long-lasting rehabilitation.
Learn more 10Accurate floor levelling that prepares for flat tiling with no hollows and no lipping between tiles.
Learn moreStart your project
Tell us the project type and location. A Marafi engineer will arrange a site visit, review your drawings and send a detailed proposal.
Contact us
Choose the easiest way to reach us and we will get back to you soon.
Follow us