
Services
General contracting services
Fourteen services covering a project from excavation and foundations to finishing and handover, contracted together or separately.
01Services
Complete projects

Villa Construction
We build your villa from excavation and foundations through the structure and finishing, with engineering supervision throughout. Learn more
Commercial Buildings
Commercial and office buildings with robust concrete structures, organised site management and strict safety. Learn more
Renovation & Rehabilitation
We turn old spaces into modern ones with long-lasting rehabilitation. Learn more02Services
Structure
Foundations & Footings
Solid foundations that start with termite treatment, a moisture barrier and blinding concrete, then footings and ground beams.
Learn more 05Structural Skeleton Works
A precise concrete frame: plumb columns, reinforced slabs and stairs, built strictly to the structural drawings.
Learn more 06Reinforced Concrete Works
Reinforcement, pouring and curing for slabs, walls, basements and tanks with modern equipment.
Learn more 07Boundary Walls & Water Tanks
Strong boundary walls and tightly waterproofed underground and roof tanks, with designed reinforcement and pours.
Learn more 08Infrastructure Works
Excavation and grading, retaining walls, concrete channels and chambers and below-ground works, done safely.
Learn more03Services
Architectural works & finishing
Blockwork & Masonry
Block walls of every type, laid true and plumb under engineering supervision.
Learn more 10Plastering
Internal and external plaster with level, even surfaces, ready for finishing with no snags.
Learn more 11Exterior Paint & Facade Finishes
Exterior profile paint with high quality and careful detailing that protects the facade and looks refined.
Learn more 12Floor Levelling & Tiling
Accurate floor levelling that prepares for flat tiling with no hollows and no lipping between tiles.
Learn more 13Interior Finishing
Gypsum ceilings and lighting, floors, paint, doors and bathrooms, with detail that reflects your taste.
Learn more 14Aluminium Kitchens
Modern aluminium kitchens built to a high standard, practical and resistant to moisture and heat.
Learn moreStart your project
Have a plot or a building that needs to be built right?
Tell us the project type and location. A Marafi engineer will arrange a site visit, review your drawings and send a detailed proposal.